Warning! Editing this pageset section will affect all pages on your website.

Lease-Leaseback Outreach Program

San Diego Unified is now using this alternative delivery method to address the challenges presented by over 70 complex projects ranging in value from $7 to $120 million. LLB is a method that streamlines complex construction projects and frees up funding.

View and download the Lease-Leaseback Fact Sheet by clicking here. The Lease-Leaseback Fact Sheet summarizes the LLB Program, defines the term Lease-Leaseback, provides networking tips including how to connect with the District's prequalified LLB Prime contractors, and much more.

To become a LLB Prime contact both Ashley Mains and Sidney Hucklebridge for more information: [email protected], and [email protected].

Contractor Prequalification

All subcontractors are required to be prequalified with San Diego Unified School District for LLB projects in order to bid. See the table below to learn if you need to get prequalified.

Lease-Leaseback Prequalification Table

For instructions click here. Email [email protected] with any questions.
Please note: San Diego Unified prequalification is in addition to any prequalification requirements the project Prime contractors may also have.

Get Connected

San Diego Unified has a robust Business Outreach Program designed to engage local and Emerging Business Enterprises (EBEs) in its construction program.  EBE is an umbrella term that includes woman-owned business enterprises (WBE), minority-owned business enterprises (MBE), disabled-veteran owned businesses (DVB), small business enterprises (SBE) and designations that may fall under each. All LLB projects have EBE goals. If you are a certified EBE, or a business that may be eligible for EBE certification, read on to see how you can become involved in the LLB program. 

Prequalified Prime Contractors

A list of ten prequalified Prime contractors has been developed. Each Prime has a designated Small Business Liaison Officer (SBLO). Each SBLO and their respective company's prequalification website links are provided below:

BALFOUR BEATTY CONSTRUCTION
SBLO
PREQUALIFICATION SITE

BARNHART-REESE CONSTRUCTION
SBLO
PREQUALIFICATION SITE

CLARK CONSTRUCTION GROUP
SBLO
PREQUALIFICATION SITE

C.W. DRIVER
SBLO
PREQUALIFICATION SITE

ERICKSON-HALL CONSTRUCTION CO.
SBLO
PREQUALIFICATION SITE

LEVEL 10 CONSTRUCTION, LP
SBLO

PREQUALIFICATION SITE

MCCARTHY BUILDING COMPANIES
SBLO
PREQUALIFICATION SITE

NEXGEN BUILDING GROUP
SBLO
PREQUALIFICATION SITE

PCL CONSTRUCTION SERVICES
SBLO
PREQUALIFICATION SITE

SOLTEK PACIFIC
SBLO
PREQUALIFICATION SITE

SUNDT CONSTRUCTION
SBLO
PREQUALIFICATION SITE

SWINERTON BUILDERS
SBLO
PREQUALIFICATION SITE

TURNER CONSTRUCTION COMPANY
SBLO

PREQUALIFICATION SITE

 
 

 

Contractor To-Do List

In addition to developing relationships with the Primes, here are some other things that subcontractors and EBEs can do to be poised to bid:

  1. Get on the San Diego Unified School District database. (Instructions) (Form)
  2. Get prequalified with SDUSD. (Instructions)
  3. Get prequalified with LLB Prime contractors (See Prime contractor information above)
  4. Apply for relevant EBE certifications, including SB-PW (Small Business for Public Works) (Resources: SDBCPTAC, For help with SB-PW certification, contact the Dept. of General Services at (916) 375-4940 or [email protected]). 

OUTREACH EVENTS

Date & Time

Event Title

Location

Registration Link

01/24/23

Lease-Leaseback Outreach Super Event. 9 Prime Contractors (In-Person)

Slidedeck: Click here

Event Complete

Upcoming Opportunities

Go to Planetbids to find current San Diego Unified School District contract opportunities by clicking here.

Upcoming Projects, Q3-Q4 2023

 

 

 

Project Name

Prime

Bids Due

Status/Links

Boone Elementary School Joint Use Field Balfour 09/12/23 Link here

Kavod Charter: Whole Site Modernization

Balfour

 

 

Baker Elementary School: WSM

Barnhart Reese

 

 

Fulton K-8: WSM

Barnhart Reese

 

 

Paradise Hills ES: WSM and JUF

Barnhart Reese

 

 

Mira Mesa High School: WSM

CW Driver

09/28/23

Link here

G.W. Smith Ed. Center Ph II: Parking Structure

CW Driver    

G.W. Smith Ed. Center Ph II: Grading/Sitework

CW Driver    

G.W. Smith Ed. Center Ph III: Abatement/Demolition

CW Driver

09/12/23

Link here

Lewis Middle School Administration Relocation and New Classroom Bldg

Nexgen

 

 

Barnard Elementary School WSM GMP 2
Soltek 09/19/23 Link here

Corriea Middle School WSM

Soltek 10/05/23 Link here 

O'Farrell Charter School Student Union Bldg

Soltek

 

 

Roosevelt International MS Site Modernization Ph II

Soltek    

Holmes Elementary School: WSM

Swinerton

 

 

Recently Awarded Projects Q2-Q3 2023

 

 

 

Project Name

Prime

Bids Due

Status/Links

Kearny High School II: WSM  Balfour 09/08/23 Closed
Spreckels ES Re-Roofing of 5 Buildings Balfour
08/10/23 Closed
King Chavez Academy of Excellence: WSM
Balfour
08/03/23 Closed
Hoover High School: WSM Ph II PCL 05/25/23 Closed
Standley Middle School – Fencing & Entryway Balfour 05/18/23 Closed
Canyon Hills HS: New Classroom Bldg Ph II Sundt 05/18/23 Closed
Rowan Elementary School: WSM Soltek 05/11/23 Closed
Oak Park Elementary School: WSM  Soltek 04/12/23 Closed
Pacific Beach Elementary School: WSM Swinerton 04/06/23 Closed

Key:

"CTE" = Career Technical Education; "JUF" = Joint Use Field
“ES” = Elementary School; “MS” = Middle School; “HS” = High School
“Ph” = Phase; “WSM” = Whole Site Modernization
Bids Due in the future are estimated dates and may change

Contacts

Still have questions? Reach out to the district's Lease-Leaseback Outreach Coordinator.

Sidney Hucklebridge-Key

Lease-Leaseback Outreach Coordinator
[email protected]
(619) 471-4960

Karen Linehan

Business Outreach Program Manager
[email protected]