District Home
Login

Overview

History of: San Diego High School & The School of International Studies

San Diego High School

1882 - 2004

Principals:

1  2 3 4
5 6 7 8
9  10 11 12
13  14 15 16
17  18 19 20
21  22
 
Grey Castle  
 

San Diego High - The Grey Castle - In Words and Pictures

 
 The following images and information through 1982 are from "San Diego High, the first 100 years". Images from photographs taken by Tim Towler and Tony Long and Steve Kleinstuber. Information provided by Matt Maclean. (Through 2004)
Images and information 2004 ->  provided by Tim Towler.
 

1882: The Russ School

 
Russ School  
 
San Diego High School had it's beginnings with the Russ School, opening August 15, 1882  This eight-room, two story building was built with lumber donated by the Hon. Joseph Russ.  In 1888, a gymnasium was built, but was soon after moved to University Heights to become a grammar school.  In 1893, the Russ School became entirely a Senior High School, with a new building added in 1898.  In 1905, it was decided to build a new High School.  The Russ School was moved to make room for the new building.  In 1911, the Russ School caught fire and burned to the ground.
 

1907: The Grey Castle

 
1907  
 
The 100 Building, known as the Grey Castle, opened April 13, 1907, and served the city for over 60 years.  In 1912, the home economics, fine arts and technical buildings were started, as were plans for Balboa Stadium.
 

1914: Building Balboa Stadium

 
1914  
 
Balboa Stadium was constructed during 1914, using Steam Shovel and mules as shown in this photo.  The Stadium opened on May 31, 1915 during the Panama-California Exposition, with a capacity of 23,000, it was the largest municipal stadium in the nation at the time.  In 1960, a second deck was added expanding the capacity to 40,000, making Balboa Stadium the largest High School Stadium in the nation.  During it's existence, Balboa Stadium has been the home field of the Chargers, and a site of the Beatles concert in San Diego.
 

1926:  San Diego High School

 
1926  
 
In 1922 and 1923 the boy's and girl's gymnasium was erected.  The Russ Auditorium was erected in 1926, seating 2500, it became the center for civic activities in San Diego.  In 1928, the Main Gymnasium was built, seating 750.
 
 

1937:  The Grey Castle

SHDS 1937  
Ivy covering the walls of the Old Grey Castle gave it the famous look that lingers in the memory of San Diego natives.
 

1939:  The Russ Auditorium

Russ Auditorium 1939  
The Russ Auditorium, seen here from Park Boulevard, was used for school assemblies, as well as being a center for civic activities until it was razed in 1973.
 

1976:  The New San Diego High School

SDHS 1976  
 In the late 1960's, legislation was passed that all school buildings constructed prior to 1933 had to be demolished due to new earthquake standards.  San Diego High School buildings had to be replaced by June 30, 1975.  The demolition of the cafeteria and Russ Auditorium began in late 1973, with construction of the four main buildings beginning in September 1974.  When the four main buildings were completed, the remaining old buildings were demolished, and the final phase of construction was started in February 1977.  The 700 building constructed in 1938, the 600 building constructed in 1940, and the 500 building constructed in 1950 remained, and are still in use on the campus.  Balboa stadium, being constructed prior to 1933 was also demolished, and was rebuilt in 1978 with 3,500 seats.
 

1982:  SDHS Centennial

SDHS 1982  
100 years after the opening of the Russ School, San Diego High School is still educating students, and a center of the community.
 

1995:  The New 800 Building

800 Building 1995  
With over 1700 students in grades 10 - 12 throughout the mid 90's, San Diego High is still growing.  Construction on the new 800 building began in September 1994, and was completed for the opening of school in September 1995.  The new 800 building is linked to the 500 building via a second story walk way, making the rooms in the upper 500 and 600 buildings wheelchair accessible.  A new entrance to the school has been constructed from Russ Boulevard leading to the plaza near the fountain.  Room 554 was renovated over the summer of 1995 to give San Diego High School a new chemistry room, with plenty of lab space.
 

2002:  New Construction Begins

To make room for a full 9th grade, and an anticipated 3,000 students, construction of two new buildings began in early 2002.  One new building will contain 31 classrooms and the other 8 modern science labs.
 

2003:  900 and 1000 Buildings Open

900 Building 2004  
The 900 building has 31 general classrooms and is the main location of classes for the new 9th grade class at SDHS.
1000 Building 2004  
The 1000 building has 8 science labs, all are configured mainly for Biology and Chemistry, but also have sufficient counter space for Physics.
 

2004:  Small Schools are Launched

SDH Ed. Complex 2004  
In June 2004, San Diego High School closed for one day, and reopened the next day as the San Diego High Educational Complex.  The Complex is comprised of six autonomous small schools, each with it's own administration, staff and approximately 500 students.  CIMA, with a communication focus, is in the 900 building.  LEADS, with a leadership focus, is in the upper 100 building.  The School of Business, with a business focus, is in the lower 100 building.  The School of the Arts, with an art focus, is in the 400 and 700 buildings.  The School of Science and Technology, with a science & technology focus, is in the 500 and 600 buildings.  The School of International Studies, which has an international focus and houses the International Baccalaureate program, is in the 800 building and upper bungalows.
School Banners 2004  
 

The School of International Studies

2004 - Present

Principals:

23  24 25
Mrs. Karen Wroblewski    Dr. Kirk Ankeney         Dr. Carmen Garcia
 
 IS 2004
 The School of International Studies opened in September 2004 with approximately 500 students and Karen Wroblewski as principal.
 

2005:  The Sierpinski Pyramid Tradition Begins

 Sierpinski Pyramid 2005
With 1024 individual pyramids made of paper, the School of International Studies began a tradition of constructing a 3 dimensional fractal called a Sierpinski Pyramid.  The finished pyramid rose approximately 16 feet in the air.  Our goal is to undergo the project every four years, so that every student at IS has a chance to participate once in their High School career.
2005 Build Team  
The 2005 Build Team.
 

2009:  Karen Wroblewski Retires

 Karen Wroblewski 2009
Karen Wroblewski, the first principal of IS (The School of International Studies), retires in June 2009.
Stadium Renovation 2009  
The Complex Stadium is refurbished with Prop. S funds, installing a new track and artificial turf on the field.
Kirk Ankeney 2009  
The School of International Studies begins the 2009/2010 school year with our second principal, Dr. Kirk Ankeney.
The bungalows on campus were moved to make space for a bus turn around near the IS garden.
2009 Sierpinski Pyramid  
2009 Sierpinski Pyramid, the second built by the students of IS.
2009 Build Team  
The 2009 Sierpinski Pyramid Build Team.
 

2010:  Construction Begins on the 1100 Building

A portion of the parking lot on the east side of Balboa Stadium, which has been leased to City College for several years has been reclaimed for staff and student parking.
1100 Building Construction 2009  
1100 Building Construction 2009  
Construction begins on the 1100 building which will replace the bungalows on campus.
 

2011:  1100 Building Opens

1100 Building 2010 South  
1100 Building 2010 North  
In September 2011, the new 1100 building opened for classes.  The Bungalows have all been removed from campus and classes are in the new building.  The School of International Studies has 8 of the 16 rooms in the new building.  Our Mathematics and Social Science departments have the bottom floor of the 1100 building.
 

2012:  The Last Bungalow is Removed

ASB Bungalow Torn Down  
ASB Building torn down  
The last of the bungalows, the ASB room was demolished on 3/3/2012.
 
 Dr. Garcia
IS begins the 2012/2013 school year with our 3rd principal, Dr.  Carmen Garcia.
 
 Blue Ribbon
The School of International Studies is recognized as a National Blue Ribbon School with a presentation in Washington D.C.
 
 

2013:  The Sierpinski Pyramid tradition continues

2013 Sierpinski Pyramid  
The third in our series of Sierpinski Pyramids.
2013 Build Team  
 2013 Sierpinski Pyramid Build Team.
 

2014:  WASC Visit - IS receives a 6 year certification

2015:  Administrative reorganization at the San Diego High Educational Complex

With the start of the 2015 - 2016 school year, The School of the Arts has closed.  The principal of IS, Dr. Carmen Garcia has been made the Complex Principal, overseeing the three small schools.  The School of International Studies, The School of Science and Technology, and The School of Business and Leadership each have a Vice Principal who oversees that school.  The School of International Studies welcomes Mrs. Daniza Montero as our Vice Principal.
 
Daniza Montero
Mrs. Daniza Montero, Vice Principal International Studies
 
 
 
Updated 9/18/2017